PreBuildIQ · Pre-development intelligence · First in Canada

Instant · Verified · $Saved

Enter any Canadian address. Get the zoning verdict, every approval body, and every required study in 60 seconds, cited to the bylaw section, at a fraction of consultant cost. + 5 more sections in every report ↓

Get my report → See what is in it
First report free. No credit card.
Instant01 / 03
0s
from address to full report

Answers while the deal is still alive.

Site diligence that takes weeks of bylaw PDFs and unreturned planner calls comes back before the meeting ends. Run it in the room, on the property you are discussing.

43 municipalities · 188+ approval bodies
Verified02 / 03
0
bylaw sections in the engine

Cited to the section, so you can check us.

The verdict is read from your municipality's own zoning fabric for the exact parcel, overlays and holding provisions included. Every standard cites its bylaw section. Not a generic AI summary.

Municipal GIS · agency terms of reference
$ Saved03 / 03
$1,000siSavings come from avoided resubmissions, fewer consultant lookup hours, and less time carrying a stalled project. Actual amounts vary with project scope and municipality. Not a guarantee.
saved on every application

One missed study costs more than a year of this.

60%+ of applications get sent back, and every resubmission means redesign fees, consultant hours, and months of added carrying cost. Know the full list before you file. Your first report is free.

Plans from $199/mo after your free report
Covering Ontario · new municipalities added monthly
TorontoMississaugaBramptonVaughanMarkhamHamiltonRichmond HillOakvilleBurlingtonMiltonNewmarketAuroraPickeringAjaxWhitbyOshawaKingstonPeterboroughGreater Sudbury
01 / The Problem

Canadian developers are flying blind into a $300B market.

A developer buys a site. Three weeks of research across 6 agencies. $25K to a planning consultant. The 1st submission still comes back rejected over one missing study, and the resubmission takes 4 months at $43K/month carrying cost, before a shovel hits dirt.

Timeline
0months
Average permit timeline in the GTA
Cost
$0K/mo
Carrying cost on a single stalled project
Rejections
0%+
Of applications require at least one resubmission
Competition
0
Canadian software platforms in this category. We are first.
02 / The Platform

The platform, screen by screen.

Two tools. Built for pre-development. Works for any Canadian address.

app.prebuildiq.ca
03 / Inside the Report

Eight sections. None of them a Google search away.

Every report reads like a drawing set: indexed, dimensioned, and cited. Assembled from zoning bylaws, municipal GIS, agency terms of reference, and planning decision records for every municipality we cover.

PRE-DEVELOPMENT INTELLIGENCE REPORT · SHEET INDEXSET A-100
A-00

Zoning verdict

As-of-right, minor variance, or ZBA. Read from your municipality's zoning fabric for the exact parcel, including holding provisions and overlays.

A-01

Suitability analysis

Every barrier between your intended use and an approvable path, ranked by severity, with the approvals, studies, weeks, and cost to clear each one.

A-02

Agency circulation

The full commenting list: planning, building, conservation authority, region, utilities. Who reviews your file and what each one requires.

A-03

Required studies

Every study your submission triggers, with the terms of reference, the consultant who produces it, market cost, and duration.

A-04

Bylaw standards

Setbacks, height, FSI, lot coverage, parking. Pulled from the governing bylaw and cited to the exact section.

A-05

Building envelope

Your maximum buildable envelope drawn to the parcel's real geometry. Plan and elevation, every setback dimensioned.

A-06

Construction cost

Structural, engineering, permit fees, finishes, HST. An all-in range for your project type and scale, plus the carrying cost of every month of delay.

A-07

Nearby decisions

How comparable applications near your site were decided: approved, refused, conditions attached. Precedent without digging through committee minutes.

Project
YOUR ADDRESS
Jurisdiction
43 MUNICIPALITIES
Turnaround
60 SECONDS
Status
READY TO RUN

Three weeks of research. A $14,000 consultant engagement. Compressed to 60 seconds.

04 / Sample Output

What a report looks like.

Try a sample scan. This illustrates real output.

Try:
Checking agency requirements, zoning by-law, and submission triggers…
05 / How It Works

Three steps. From land to permit.

Built around how developers actually work.

Phase 01KNOW

Know the site. Before you commit.

Enter an address. Get your zoning verdict, every approval agency, every required study, and every submission trigger. In 60 seconds.

  • Zoning verdict: as-of-right, ZBA, or minor variance
  • Suitability barriers + remediation path
  • Agency circulation, studies, and ToRs
  • Construction cost + carrying cost forecast
Phase 02CHECK

Check the drawings. Before you file.

Upload drawings. Catch OBC violations and zoning conflicts before the reviewing agency does. One clean 1st submission saves months.

  • OBC Part 3 compliance review
  • Zoning by-law and setback checks
  • Drawing conflict detection
  • Section-cited comment responses
Phase 03ROADMAPFILE

File and track. Ship it.

File directly. Track every submission across every agency in one view. Get alerts the moment a review stalls.

  • Direct portal submission
  • Live agency review dashboard
  • Stall detection alerts
  • Commenting package response tracking
06 / Who It's For

Built for the people on the ground.

Canadian developers, GCs, and architects spending weeks on research that should take minutes.

Developers

5–20 projects per year with no in-house planning team. Know your zoning verdict, your ZBA exposure, and your full agency circulation list before you commit capital. Not after.

Architects + GCs

You prepare the drawings. You face the reviewing agencies. PreBuildIQ catches OBC and zoning by-law violations before the 1st submission so your commenting package comes back clean.

Expeditors

Deliver same-day pre-consultation packages instead of two months of manual research. Handle more clients across more jurisdictions, without adding headcount.

07 / Why PreBuildIQ

A Canadian dataset nobody else has.

US platforms don't have Canadian municipal data. Generic AI tools don't have it. We're building it, municipality by municipality, from the portal up.

  • ✓

    Proprietary Canadian data

    Built to scrape and update weekly from hundreds of Canadian municipal portals. No US platform has this dataset.

  • ✓

    Terms of reference, by jurisdiction

    What each required study needs, who produces it, what the agency expects. For every municipality we cover.

  • ✓

    Canadian code, from day one

    Built for the OBC and Canadian regulatory structure. Not a US engine adapted for Canada.

  • ✓

    Zoning intelligence, not just permit tracking

    Knowing you need a ZBA before you commit capital is worth more than any permit dashboard.

08 / Pricing

Simple pricing. Full report.

Start free. When you need more, run a single site. No subscription required.

FreeNO CARD
$0 / forever
  • 1 full report at sign-up, all eight sections
  • After that: zoning verdict + summary view
  • 1 drawing compliance check
  • No credit card
Single ReportRECOMMENDED
$499 / one time
  • Full report, all eight sections, address stays unlocked
  • Every agency, study, and bylaw standard
  • Suitability analysis + path to permit
  • Construction cost + carrying cost calculator
  • Nearby council decisions (precedents)
  • Export to CSV and Word. No subscription.
Pre-application service, retailMarket rate
Agency identification and circulation mapping$2,500–$4,000
Required studies scoping (TMP, EIS, HIA, FSR)$3,000–$8,000
Zoning compliance review and verdict$2,000–$4,500
Pre-consultation package preparation (ZBA)$5,000–$12,000
Approval timeline and carrying cost forecast$1,500–$3,000
Total per pre-application engagement$14,000–$31,500+

PreBuildIQ covers all of this in 60 seconds. Your first report is free, and a single site is $499 with no subscription.

09 / Questions

Asked before every first report.

Q-01What does a report include?
Eight sections for any address: the zoning verdict (as-of-right, minor variance, or ZBA), a suitability analysis with every barrier ranked by severity, the full agency circulation list, required studies with terms of reference and market costs, bylaw standards cited to the exact section, a building envelope drawn to your parcel, an all-in construction cost range, and how comparable nearby applications were decided. In 60 seconds.
Q-02Which municipalities do you cover?
43 Ontario municipalities including Toronto, Mississauga, Brampton, Vaughan, Markham, Hamilton, Oakville, Burlington, and Richmond Hill. New municipalities added monthly.
Q-03Where does the data come from?
Municipal zoning bylaws, municipal GIS parcel and zoning data, agency terms of reference, and planning decision records for every covered municipality, kept current as bylaws change. Not scraped blog content. Not a generic AI summary.
Q-04Does this replace my planning consultant?
No. It front-loads the research a consultant spends the first weeks of an engagement assembling, so you walk into pre-consultation informed and spend consultant hours on strategy instead of lookup. Planning consultants and permit expeditors are among our heaviest users.
Q-05How accurate is the zoning verdict?
The verdict is read from your municipality's own zoning fabric for the exact parcel, including holding provisions and overlays, and every bylaw standard is cited to its section so you can verify it yourself. PreBuildIQ is decision support for pre-development diligence, not legal advice.
Q-06What does it cost?
Your first full report is free, no credit card. A single site is $499 one-time with the address unlocked permanently. A comparable consultant pre-application engagement runs $14,000 to $31,500.
FIRST REPORT FREE · NO CARD

Stop losing months. Start knowing.

First report free. No credit card. Built for Canadian developers, architects, and permit expeditors.

3 design partners · 2 signed LOIs · Built in Toronto
info@prebuildiq.ca
See more ↓